acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6121Operational efficiency during design and build
Process safety focus within the operation
Reporting and investigating key parameters
Lean Routine Centred Maintenance SQA (RCM)
WAMITAB Level 4
Senior Project Manager
As a senior project manager, Stefan is able to apply his 11 years operational experiences to projects with CNG. Stefan has operated multiple AD plants, Gasification and municipal waste sites. During his time operating these, his eye for efficiencies, good practices and safety standards have always taken priority.
Most recently, Stefan has managed an Agricultural residue AD plant with CHP and Biomethane to grid connection into the NGG NTS. The operating pressure for this connection was circa 65Bar.
Operational efficiency during design and build
Process safety focus within the operation
Reporting and investigating key parameters
Lean Routine Centred Maintenance SQA (RCM)
WAMITAB Level 4
Please fill in the contact form below and a member of the team will be in touch with you shortly.