Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6121
Stefan Banks - CNG Services
Linkedin Logo
Stefan Banks border

Key Capabilities

Operational efficiency during design and build

Process safety focus within the operation

Reporting and investigating key parameters

Qualifications

Lean Routine Centred Maintenance SQA (RCM)

WAMITAB Level 4

Stefan Banks

Senior Project Manager

As a senior project manager, Stefan is able to apply his 11 years operational experiences to projects with CNG. Stefan has operated multiple AD plants, Gasification and municipal waste sites. During his time operating these, his eye for efficiencies, good practices and safety standards have always taken priority.

Most recently, Stefan has managed an Agricultural residue AD plant with CHP and Biomethane to grid connection into the NGG NTS. The operating pressure for this connection was circa 65Bar.

Key Capabilities

Operational efficiency during design and build

Process safety focus within the operation

Reporting and investigating key parameters

Qualifications

Lean Routine Centred Maintenance SQA (RCM)

WAMITAB Level 4

border

CONTACT US

Please fill in the contact form below and a member of the team will be in touch with you shortly.