disable-gutenberg
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114limit-login-attempts-reloaded
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114Trouble shooter in support of more complex projects
Safety assessments
Innovation in equipment designs
BSc Gas Engineering
CEng, MIGEM
Technical Lead BtG
Iain delivered and commissioned the first Biomethane to Grid project in the UK, including inventing the fundamental design principles, securing the various GDN compliance requirements, maximising the supply chain and achieving regulatory approvals. He has since directly managed or contributed to completion of over 40 BtG projects. He has over 46 years gas industry experience in technical, managerial and regulatory capacities in gas distribution and transmission, including leadership of the Distribution National Control Centre, at that time this meant ensuring safe and efficient operation of every controlled gas network downstream of the NTS
Trouble shooter in support of more complex projects
Safety assessments
Innovation in equipment designs
BSc Gas Engineering
CEng, MIGEM
Please fill in the contact form below and a member of the team will be in touch with you shortly.