disable-gutenberg
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114limit-login-attempts-reloaded
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114Biomethane injection to gas grid
Project Management
Gas Innovation i.e. within-grid compression
Certificate in Management, Institute of Supervision and Management
BEng (Hons) Chemical Engineering
Business Development Director
An experienced Senior Project Manager, Colin has worked on several major Biomethane to Gas Grid projects for CSL, including: Roundhill Biomethane to Grid – project management of the £4.5m project, overseeing design, consultancy, construction and commissioning of the Biomethane to Gas Grid plant. Derby, Stoke Bardolph and Strongford Biomethane to Grid projects – project management of the £3.0m project, also overseeing the design, consultancy, construction and commissioning of the three Biomethane to Gas Grid projects. Plus the Project Management of a further five Biomethane to Gas Grid projects ranging from £250k to £1.75m
Biomethane injection to gas grid
Project Management
Gas Innovation i.e. within-grid compression
Certificate in Management, Institute of Supervision and Management
BEng (Hons) Chemical Engineering
Please fill in the contact form below and a member of the team will be in touch with you shortly.