acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6121Renewable gas injection to gas grid
Gas utilization
Gas pipeline management
Gas Quality
ICPN1 - First Fix for Commercial Pipework
TPCP1 - Strength Testing, Tightness Testing & Purging (<16bar)
Building Regs (Gas)
Construction Director
Chris Magness has over 39 years’ experience in the gas industry. In 2009, he joined Asset Management as the 3rd Party Connections Manager. This role expanded to include biomethane connections in 2013, since then, Chris has facilitated all 19 of the current biomethane connections on the WWU network. Chris has spearheaded the development and streamlining of the WWU biomethane connections procedure, gaining a vast amount of experience, both operationally and managerially of these plants in the process
Renewable gas injection to gas grid
Gas utilization
Gas pipeline management
Gas Quality
ICPN1 - First Fix for Commercial Pipework
TPCP1 - Strength Testing, Tightness Testing & Purging (<16bar)
Building Regs (Gas)
Please fill in the contact form below and a member of the team will be in touch with you shortly.