disable-gutenberg
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114limit-login-attempts-reloaded
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114Operational Improvements
Project Management
Biomethane Injection
MSc Chemical & Petroleum Engineering
BEng (Hons) Chemical Engineering
Senior Project Manager
Amaani is from the Oil & Gas industry with experience offshore and onshore for installation of electrical submersible pumps. After moving to a more sustainable energy fuel sector, she has worked on biomethane injection plants, LNG CNG and L/CNG refuelling stations.
Amaani has led complex modification projects within operational biomethane injection and refuelling sites along with continuous improvement. Now as a senior project manager, she manages projects for the biomethane sector.
Operational Improvements
Project Management
Biomethane Injection
MSc Chemical & Petroleum Engineering
BEng (Hons) Chemical Engineering
Please fill in the contact form below and a member of the team will be in touch with you shortly.