disable-gutenberg
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114limit-login-attempts-reloaded
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114Our dedicated team for above and below 7 bar pipelines and associated pipework work on a variety of projects including, but not limited to, biomethane injection pipelines, Bio-CNG filling stations and back up gas fired power generation sites. We work on projects that involve the design, installation, testing and commissioning of assets for gas networks, as well as private assets owned by third parties.
Projects are followed through to full completion and involve all stages of the pipeline lifecycle, including but not limited to:
We also take on pipeline duty holder responsibilities for selected pipelines and can provide services to ensure private pipelines are in full compliance with HSE guidelines and GS(M)R, PSR and PSSR requirements.
In the period since 2014 we have constructed over 40 below 7bar projects and over 30 above 7bar projects adopted by Gas Network Operators (GNOs) and private pipeline operators, including connecting to the Local Transmission (LTS) and National Transmission Systems (NTS) as well as the below 7bar Intermediate Pressure (IP), Medium (MP) and Low Pressure (LP) networks.
CNG Services’ below 7 bar team manages the design and construction of all connecting pipelines required to Gas Network Operator (GNO) LP/MP and IP gas networks. This includes the design and construction of connections and pipelines for GNO adoption under the Gas Industry Registration Scheme (GIRS) as well as facilities for adoption by private network operators. CNG Services is registered under GIRS for Design and Project Management and we always use GIRS registered subcontractors for pipework installation.
Connections to the below 7 bar networks are a good first option as the installation costs are significantly lower and the design timelines shorter than for high-pressure connections. In cases where the below 7bar network is limited in offtake or entry capacity, we can offer the option of connection to a higher pressure network through the above 7 bar pipelines team.
Above 7 bar team manage the design and construction of all connecting pipelines required to Gas Network Operator (GNO) NTS and LTS high-pressure gas transmission networks. This includes the design and construction of connections and pipelines for GNO adoption under the GNO self-lay process. CNG Services has been audited and registered with DNVGL as an above 7 bar G17 Design Organisation meeting the same requirements as GNO framework design organisations and we use GNO framework subcontractors for construction. High-pressure connections provide the benefit of better entry and entry network capacity and also reduced compression costs where higher pressures are required for CNG usage.
CNG Services Ltd. have a completed over 30 Local Transmission System (LTS) pipelines and connections, covering biomethane injection pipelines, Bio-CNG filling stations for HGVs and power generation sites. These projects span across various gas networks operating in the UK and we have successfully designed, installed and commissioned high pressure assets that have been adopted by major network providers and private pipeline operators.
We will normally offer the connection and pipeline works under a self lay process where CNG Services manages the design and construction of the assets for the network operator to adopt. This provides the customer with a more competitive quote, improved timelines and greater transparency. We also provide a design and construction service for the client’s interconnecting high pressure pipework which enables better efficiency for the whole connection process. We are always keen to use innovation to improve the efficiency of our connections process.
Some of our key innovation LTS projects include:
For private pipelines we can also develop Safety Cases and Major Accident Prevention Documents (MAPD) in compliance with the Gas Safety Management Regulations (GSMR) and Pipeline Safety Regulations (PSR) as well as inspection regimes for compliance with the Pressure System Safety Regulations (PSSR). We can also offer a pipeline operator service to manage the 24/7 operation of private pipelines including all maintenance, inspection and emergency arrangements.
Using the experience from our self lay LTS projects, CNG Services has worked with National Grid Gas (NGG) to deliver the first National Transmission System (NTS) self lay connection projects in the UK. During the process and working with NGG we were able to deliver a simplified exit connection design without the need for an ROV. This enabled a more cost effective connection and improved construction timeline.
As with LTS projects we will offer future NTS connection works under a self lay process providing customers with a more competitive quote, improved timelines and greater transparency. We also provide a design and construction service for the client’s interconnecting NTS rated high pressure pipework enabling better efficiency for the whole connection process.
Key innovation NTS projects include:
Please fill in the contact form below and a member of the team will be in touch with you shortly.