A 7 bar pipeline was installed to reduce capital expenditure. It was significantly cheaper and easier to build an intermediate pressure pipeline than a high-pressure pipeline
The remote compound was built to house compressors and an ROV, where gas is compressed to 42 bar and injected into the network. This was the first use of this particular layout in the UK
It was decided to manage the risk of having out-of-specification gas trapped in the pipeline in the event it was rejected at the GEU, negating the requirement for a remote reject line
CONTACT US
Please fill in the contact form below and a member of the team will be in touch with you shortly.