Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6121
Ledbury - CNG Services
Linkedin Logo

Project

Ledbury

Client

Heineken UK

Completion

August 2019

Project Outcomes

  • The project bundled the design and construction of the MP pipeline system, extending from the end of the local Cadent MP network to the new meter position.
  • The CSL design enabled the connection to take place without the need for specific reinforcement, whilst accommodating the potential for further growth in demand on the site as the processes develop.
  • The route for the supply took in local parkland, a major traffic island, and a significant directional drill under a local brook.
  • CSL undertook the role of PC and PD for the project, bringing in supporting services were required to undertake key activities.
  • The project was monitored under the CSL SHEQ framework and externally audited for compliance
  • Completion of the project to program was critical to the production season and satisfactorily delivered on time.