Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the disable-gutenberg domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the limit-login-attempts-reloaded domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6114
Leyland - CNG Services
Linkedin Logo
Bio CNG Bio CNG Bio CNG

Project

Leyland

Client

CNG Fuels

Completion

2016

Project Outcomes

  • CSL identified significant compression cost savings by taking gas from the LTS network – as shown in the graph.
  • It was recognized there was no need to regulate pressure to protect downstream appliances since gas requires further compression. CSL presented the case to the HSE to gain exemption – causing industry rules to change.
  • A detailed analysis and risk assessment was performed to eliminate the requirement of an ROV.
  • Since the compressors are capable of processing 2000 kg/h of Bio-CNG to the truck pressure (250 bar), gas is stored in a buffer vessel at 300 bar, to avoid potentially damaging quick stop-starts if Bio-CNG was directly supplied into trucks.