acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6121Project management
Renewable gas injection to gas grid
Process safety
CO2 liquefaction
BEng – Mechanical Engineering
SMSTS – Site management safety training scheme
Project Engineer
Michael is a First-Class Honours graduate in Mechanical Engineering from Ulster University and has beenworking as a project engineer in the renewable energy sector since 2018. He has contributed to significant projects, including Northern Ireland’s first biomethane injection installation at Granville with SGN – Evolve. Additionally, Michael has experience in designing and installing Carbon Dioxide liquefaction plants at operational Anaerobic Digestion sites. As the site CDM manager during the Carbon Dioxide project, he oversaw subcontractors and ensured the safe execution of installation works. His hands-on experience with Anaerobic Digestion projects has equipped him with strong technical expertise, in-depth process knowledge, and a comprehensive understanding of health and safety regulations on site.
As the site CDM manager during the Carbon Dioxide project, he oversaw subcontractors and ensured the safe execution of installation works. His hands-on experience with Anaerobic Digestion projects has equipped him with strong technical expertise, in-depth process knowledge, and a comprehensive understanding of health and safety regulations on site.
Project management
Renewable gas injection to gas grid
Process safety
CO2 liquefaction
BEng – Mechanical Engineering
SMSTS – Site management safety training scheme
Please fill in the contact form below and a member of the team will be in touch with you shortly.