acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/cngservices.co.uk/httpdocs/wp-includes/functions.php on line 6121Biomethane injection to grid
Pipeline installation management
Pipeline route surveys
Pipeline Capex estimating
Engineering Technician Gas and Water
NVQ4 Gas Engineering
City and Guilds Gas Distribution
City and Guilds Design of LP networks
Safe Control of Operations CP/AE
Senior Pipelines Engineer
Pete has 48 years’ experience in the gas industry having joined South-West Gas in 1976 as a Distribution Apprentice. With a strong quality and safety ethic he has worked on gas transmission pipelines and distribution networks in the UK and overseas, including the 522km Moroccan section of the 48” Maghreb-Europe. Career emphasis has been on pipeline installation and installation management, delivering projects on time and to budget.
Biomethane injection to grid
Pipeline installation management
Pipeline route surveys
Pipeline Capex estimating
Engineering Technician Gas and Water
NVQ4 Gas Engineering
City and Guilds Gas Distribution
City and Guilds Design of LP networks
Safe Control of Operations CP/AE
Please fill in the contact form below and a member of the team will be in touch with you shortly.